Tired of spending thousands every year on electricity, chemicals, and repairs? We provide full-service pool demolition, engineered backfill, and complete San Diego city permitting.
C-21 / Class A Network
DSD Specs & Inspections
3-5 Day Site Completion
Enter your address to request a remote aerial analysis and price breakdown.
San Diego utility and service costs make keeping an unused pool one of the biggest cash drains in residential homeownership.
Eliminating the pool pays for demolition in ~2 to 3 years and unlocks instant monthly cash flow.
Stop The Drain TodayWe offer both partial engineered backfills and complete concrete shell extractions.
The top 24–36 inches of gunite shell is broken down into the cavity, major core drainage holes are punctured through the floor, and the area is backfilled with certified clean soil.
100% of the concrete, rebar, and coping is completely jackhammered, loaded into dump trucks, and hauled off-site. The entire cavity is backfilled with 100% clean engineered fill.
From initial satellite analysis to city inspection sign-off.
We analyze your backyard layout, side yard machinery access, and lot boundaries using aerial satellite modeling.
We submit grading specs to the City of San Diego and coordinate safe capping of all gas, electric, and water lines.
Hydraulic breakers puncture deep drainage holes, dismantle the perimeter, and import clean soil compacted in 8" lifts.
City inspectors complete final grading review, sign off on the permit, leaving your yard clean, level, and ready for use.
Everything you need to know about removing a pool in San Diego County.
Yes. The City of San Diego Development Services Department (DSD) regulates pool demolition under grading and site safety codes. We handle permit preparation, drainage plan filings, and inspection coordination.
Not when done correctly. Clean fill dirt is placed in 8 to 12-inch layers ("lifts") and mechanically compacted to 90%+ relative compaction, preventing sinkholes and ground settling.
Permit approvals usually take 5–10 business days. The physical demolition, backfill, and compaction work takes roughly 3 to 5 business days on-site.